Your Year, Wrapped
Quality Control Engineer | Data Analyst | Business Intelligence (BI) Developer | Materials Testing Specialist
Scroll to begin
Chapter 01 — The numbers
Chapter 02 — Top tracks
Chapter 03 — Most-played project
Designed and developed the 'Mega Infrastructure BI & Intelligence System,' a full-scale business intelligence and quality control analytics platform built for the Mega South Med project (TMG) - one of Egypt's largest real estate and infrastructure developments. The platform converts raw laboratory quality control data (DPL, Sand Cone, Plate Load, Soil, and Gradation tests) into real-time, decision-ready quality intelligence, enabling engineering and QA/QC teams to detect quality deviations, monitor contractor compliance, and enforce ASTM standards across thousands of field submittals.
Chapter 04 — The tour
DR. Khaled Kandel Consulting Engineering Laboratory
Conducted comprehensive asphalt mix design using the Marshall Method and supervised field production to ensure conformance with project specifications and ASTM standards. Performed soil and asphalt laboratory testing including CBR, Proctor Compaction, Marshall Stability, Extraction, and Gradation tests in accordance with ASTM standards. Executed quality control for all road construction layers including subgrade, subbase, base course, and asphalt wearing courses. Prepared and reviewed technical compliance reports; coordinated with site teams to identify and resolve material non-conformances. Applied data analysis techniques to track laboratory test results over time, identify performance trends, and flag deviations before they escalated into field problems.
South Med Egypt (TMG)
Led coordination and management of multiple materials laboratories within one of Egypt's largest real estate infrastructure projects. Supervised all laboratory activities including soil testing, asphalt testing, and aggregate testing in compliance with ASTM standards. Designed and implemented a structured data analysis system for laboratory results, enabling faster data-driven quality assurance decisions. Standardized laboratory report formats across all project labs, improving consistency and significantly reducing reporting errors. Served as the central communication point between laboratories, the technical office, and the quality assurance team. Ensured timely documentation, proper archiving, and full compliance with project technical specifications.
Chapter 06 — The receipts
— Al Azhar University, Assuit, Egypt
Google / Coursera
IBM
IBM
IBM
IBM
E Youth
Edraak
Chapter 07 — Off the record
That's a wrap.
Mohamed Hatem Hamed. Reach out, or share this story.
Built with Portify